WSGC Commercial · Medical & clinical

Clinical space, compliant before it's drawn.

Medical, dental, and clinical buildouts where occupancy, accessibility, and health-department review are mapped before the proposal - not discovered at inspection.

What we check before you commit

The medical & clinical rules that decide the schedule

Occupancy classification decides everything

Outpatient clinic or business occupancy? The answer changes sprinklers, separations, and plumbing counts. We classify the intended use against the code path first, because getting it wrong mid-build is the most expensive mistake in clinical construction.

Accessibility is a design input, not a punch item

Exam-room clearances, accessible routes, toilet-room dimensions, and transfer space - ADA and ANSI A117.1 requirements get laid into the test fit, where fixing them costs nothing.

Health-department and specialty reviews run parallel

Jurisdiction plan review is not the only gate: health-department requirements, medical-gas certification where scope requires it, and equipment vendor coordination (chairs, imaging, sterilization) each carry their own clock. We run them in parallel so none of them becomes the schedule.

Carried by us

What full-service means for medical & clinical

  • Use-and-occupancy read for the intended clinical program
  • ADA/accessibility layout check in the free test fit
  • Health-department and jurisdiction review paths mapped with dates
  • Medical equipment rough-in coordination with your vendors
  • Closeout with inspection records and O&M your compliance file needs
Start here

Tell us about the space

A free test fit and feasibility read within 24 hours - the address, the use, and where the lease stands is enough to start. Project references available during consultation.

Prefer the phone? (480) 553-8406 - 24/7.

WSGC LLC · AZ ROC #365643 · KB-1 Dual Building Contractor