Flex and industrial space, planned around the racking.
Warehouse offices, shop space, and flex conversions - clear heights, power, and fire protection read against how you'll actually use the building.
The light industrial rules that decide the schedule
Storage height changes the fire code
High-piled storage thresholds, commodity classifications, and sprinkler densities turn on what you store and how high. We read your racking plan against the fire code before the lease is signed - not after the fire marshal visits.
Power is the hidden long-lead
Service upgrades, transformer availability, and switchgear lead times can outrun the entire buildout. The test fit includes an honest power read: what the building has, what your equipment needs, and what the utility's calendar says about the gap.
Office-in-warehouse is a code boundary
Mezzanines, occupancy separations, and restroom counts for the office component inside an industrial shell - small square footage, disproportionate code consequence. We draw the boundary correctly the first time.
What full-service means for light industrial
- Clear-height, dock, and column-grid fit against your operation
- Fire-protection and high-piled storage read in the free test fit
- Utility service and equipment power gap analysis
- Mezzanine and office-component code path mapped
- Phased buildout options if you need to operate during the work